Revision history of "Construction of Dubina 3 photovoltaic power plant" (Q2711213)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:2521:25, 2 March 2023DG Regio talk contribs 74,116 bytes −1,129 Changed label, description and/or aliases in da, it, sk, lv, fi, de, bg, ga, hu, pt, sv, et, ro, mt, sl, hr, cs, lt, es, el, fr, nl, and other parts

20 October 2022

28 July 2022

  • curprev 02:5602:56, 28 July 2022DG Regio talk contribs 74,432 bytes +47,682 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

15 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 22:4122:41, 7 July 2021DG Regio talk contribs 12,956 bytes +108 Changed label, description and/or aliases in en: translated_label
  • curprev 22:4122:41, 7 July 2021DG Regio talk contribs 12,848 bytes +2,450 Created claim: summary (P836): The project concerns an investment in the construction of a new electricity generation unit with a capacity of 999 kW with connection to the distribution/transmission network in accordance with the technical documentation on land plots with geod No. 336/5 and 337/4, Dubina, Hajnówka. The components of the installation of a photovoltaic farm consist of: − silicon photovoltaic panels grouped into units of up to 4000 units – DC/DC and Dc/Ac inverte...

21 May 2021