Revision history of "Installations dedicated to renewable energy sources on public buildings of the Municipality of Czyżew" (Q2711208)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

20 October 2022

28 July 2022

  • curprev 02:5602:56, 28 July 2022DG Regio talk contribs 73,575 bytes +47,308 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

15 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 22:4122:41, 7 July 2021DG Regio talk contribs 12,775 bytes +162 Changed label, description and/or aliases in en: translated_label
  • curprev 22:4122:41, 7 July 2021DG Regio talk contribs 12,613 bytes +2,292 Created claim: summary (P836): The project concerns the installation of photovoltaic installations and heat pumps in the municipality of Czyżew. The following RES installations will be carried out as part of the project: 1. Rosochate Kościelne hydrophore – photovoltaic installation with a power of 39,65 kW, 2. Sewage treatment plant, ul. Mazowiecka, Rosochate Kościelne – photovoltaic installation with a power of 9.76 kW, 3. Hydrophore in Czyżewo, ul. Zarzecze – photovoltaic i...

21 May 2021