Revision history of "Construction of a photovoltaic installation for the Mjr Primary School. Henryk Dobrzański “Hubala” in Sejny" (Q2711171)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 19:5019:50, 10 October 2024DG Regio talk contribs 89,197 bytes 0 Changed label, description and/or aliases in pt
  • curprev 19:5019:50, 10 October 2024DG Regio talk contribs 89,197 bytes +20 Set a claim value: summary (P836): O objeto do estudo é a construção de uma instalação fotovoltaica (PV) na rede com uma capacidade de, pelo menos, 27,54 kWp, para a produção de eletricidade a partir da radiação solar para efeitos da Escola Primária de Mjr. Henryk Dobrzański «Hubala» em Sejny. O âmbito dos trabalhos previstos inclui: — instalação de uma estrutura de montagem do sistema no tejadilho inclinado para painéis fotovoltaicos; — instalação de módulos fotovoltaicos monocrista...

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:2521:25, 2 March 2023DG Regio talk contribs 86,416 bytes −545 Changed label, description and/or aliases in it, da, lv, fi, sk, bg, cs, hr, pt, fr, nl, el, ro, de, mt, hu, lt, sv, sl, es, et, ga, and other parts

20 October 2022

10 July 2022

  • curprev 18:5418:54, 10 July 2022DG Regio talk contribs 86,146 bytes +56,226 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

15 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 22:4122:41, 7 July 2021DG Regio talk contribs 13,753 bytes +172 Changed label, description and/or aliases in en: translated_label
  • curprev 22:4122:41, 7 July 2021DG Regio talk contribs 13,581 bytes +2,765 Created claim: summary (P836): The subject of the study is the construction of an on-grid photovoltaic (PV) installation with a capacity of at least 27.54 kWp, for the production of electricity from solar radiation for the purposes of the Mjr Primary School. Henryk Dobrzański “Hubala” in Sejny. The scope of the planned work includes: — installation of a system mounting structure on the slanted roof for photovoltaic panels; — installation of monocrystalline photovoltaic module...

21 May 2021