Revision history of "Construction of three photovoltaic installations with a total capacity of 75.84 kWp for the needs of the Archdiocese of Bialystok" (Q2711167)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 18:5218:52, 7 October 2024DG Regio talk contribs 89,316 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:5218:52, 7 October 2024DG Regio talk contribs 89,317 bytes +58 Set a claim value: summary (P836): O objectivo do projecto é a execução de 3 iniciativas fotovoltaicas: 1.Telhado inst. com uma potência de 17,92 kWp no telhado da Pastoralno-Administrative Metropolitan Curia Bialystok, ul. Igreja 1, 15-087 Białystok, (14001.15 kWh por ano) 2o telhado inst. com uma potência de 17.92 kWp no telhado do Centro de Exposições e Conferências da Arquidiocese de Bialystok, ul. Eclesiástico 1A, 15-087 Białystok, (14457,02 kWh por ano) 3. instalação de terra e...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:2521:25, 2 March 2023DG Regio talk contribs 86,498 bytes −293 Changed label, description and/or aliases in lv, da, it, bg, sk, et, hr, lt, es, ro, pt, ga, hu, fr, sv, de, sl, nl, el, cs, mt, fi, and other parts

20 October 2022

10 July 2022

  • curprev 18:5418:54, 10 July 2022DG Regio talk contribs 85,973 bytes +55,795 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

15 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 22:4022:40, 7 July 2021DG Regio talk contribs 13,832 bytes +189 Changed label, description and/or aliases in en: translated_label
  • curprev 22:4022:40, 7 July 2021DG Regio talk contribs 13,643 bytes +2,775 Created claim: summary (P836): The object of the project is the execution of 3 photovoltaic initiatives: 1.Roof inst. with a power of 17.92 kWp on the roof of the Pastoralno-Administrative Metropolitan Curia Bialystok, ul. Church 1, 15-087 Białystok, (14001.15 kWh per year) 2nd roof inst. with a power of 17.92 kWp on the roof of the Exhibition and Conference Centre of the Archdiocese of Bialystok, ul. Ecclesiastical 1A, 15-087 Białystok, (14457.02 kWh per year) 3. ground and...

21 May 2021