Revision history of "Revitalisation of railway line 49 on the section Śniadowo – Łomża" (Q2711113)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 07:1607:16, 11 October 2024DG Regio talk contribs 91,812 bytes −7 Changed label, description and/or aliases in pt
  • curprev 07:1607:16, 11 October 2024DG Regio talk contribs 91,819 bytes −53 Set a claim value: summary (P836): O objetivo do projeto é preparar a documentação de pré-conceção e conceção da infraestrutura técnica ferroviária, juntamente com as leis, licenças e disposições necessárias para a execução das obras de construção, incluindo o desenvolvimento de: 1)Resultados de um estudo de viabilidade para o pedido de financiamento para a fase de obras de construção; 3)Pedido completo de decisão de AIA juntamente com o PIN para o projeto intitulado Revitalização da...

20 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:2521:25, 2 March 2023DG Regio talk contribs 86,055 bytes +1,297 Changed label, description and/or aliases in lv, da, it, sk, ro, fr, sv, fi, hr, et, ga, sl, lt, de, pt, bg, hu, nl, es, mt, cs, el, and other parts

25 October 2022

20 October 2022

27 September 2022

28 July 2022

  • curprev 02:5502:55, 28 July 2022DG Regio talk contribs 82,727 bytes +52,730 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 May 2022

19 January 2022

15 January 2022

18 December 2021

15 December 2021

4 December 2021

3 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 22:3922:39, 7 July 2021DG Regio talk contribs 15,409 bytes +129 Changed label, description and/or aliases in en: translated_label
  • curprev 22:3922:39, 7 July 2021DG Regio talk contribs 15,280 bytes +2,708 Created claim: summary (P836): The aim of the project is to prepare the pre-design and design documentation of the railway technical infrastructure together with the required laws, permits and arrangements necessary for the execution of the construction works, including the development of: 1)Results of a feasibility study for the application for funding for the stage of construction works; 3)Complete application for an EIA decision together with the NIP for the project entitl...

21 May 2021