Revision history of "Implementation of the results of own R & D work in the field of innovative wood sawing technology." (Q2709752)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 08:1308:13, 10 October 2024DG Regio talk contribs 90,423 bytes +6 Changed label, description and/or aliases in pt
  • curprev 08:1308:13, 10 October 2024DG Regio talk contribs 90,417 bytes +2 Set a claim value: summary (P836): O projeto será executado no distrito de Strabli, Wyszki, na rua Wesoła, n.o 27. A data de início prevista para a execução material do projeto é 3.8.2020 e o final de 30.7.2021. O projeto realizará as seguintes atividades: compra de linha de serração, compra de máquina de serração de duas faces, compra de linha até 2,5 m de toro, compra de cortador de tambor, compra de um sistema de medição de madeira sem casca com módulo dedicado para otimização do...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:2221:22, 2 March 2023DG Regio talk contribs 87,594 bytes +490 Changed label, description and/or aliases in lv, da, it, bg, sk, et, hr, ro, sv, es, fr, de, lt, hu, pt, nl, ga, sl, el, fi, mt, cs, and other parts

24 October 2022

28 July 2022

  • curprev 02:4402:44, 28 July 2022DG Regio talk contribs 86,292 bytes +56,357 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 22:0322:03, 7 July 2021DG Regio talk contribs 13,846 bytes +157 Changed label, description and/or aliases in en: translated_label
  • curprev 22:0322:03, 7 July 2021DG Regio talk contribs 13,689 bytes +2,790 Created claim: summary (P836): The project will be implemented in Strabli district Wyszki at 27 Wesoła Street. The planned start date for the material implementation of the project is 03.08.2020 and the end of 30.07.2021. The project will carry out the following activities: purchase of sawmill line, purchase of double-sided sawing machine, purchase of line to 2.5 m log, purchase of drum chipper, purchase of a measuring system of unshelled lumber with dedicated module for opti...

21 May 2021