Revision history of "Construction of a new sewage treatment plant in Prószków with reconstruction and extension of the existing facility" (Q2709551)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 21:5821:58, 8 October 2024DG Regio talk contribs 85,356 bytes +86 Set a claim value: summary (P836): O objetivo do projeto é a construção de uma estação municipal de tratamento mecânico-biológico de águas residuais sociais-residenciais (municipal) com apoio químico para a redução de nutrientes em Prószków. A estação de tratamento também receberá águas residuais industriais biologicamente degradáveis. A capacidade nominal hidráulica prevista da estação de tratamento será de 900 m3/d. A estação de tratamento de águas residuais funcionará 24 horas por...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

23 October 2022

10 July 2022

  • curprev 18:1418:14, 10 July 2022DG Regio talk contribs 81,266 bytes +52,636 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 21:5921:59, 7 July 2021DG Regio talk contribs 13,431 bytes +177 Changed label, description and/or aliases in en: translated_label
  • curprev 21:5921:59, 7 July 2021DG Regio talk contribs 13,254 bytes +2,608 Created claim: summary (P836): The object of the project is the construction of a municipal mechanical-biological treatment plant for social-residential wastewater (municipal) with chemical support for the reduction of nutrients in Prószków. The treatment plant will also receive biologically degradable industrial waste water. The planned hydraulic nominal capacity of the treatment plant will be 900 m³/d. The wastewater treatment plant will operate 24/7 365 days a year. After...

21 May 2021