Revision history of "Zator bypass, Podolsza" (Q2708822)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 06:5206:52, 11 October 2024DG Regio talk contribs 86,732 bytes +3 Changed label, description and/or aliases in pt
  • curprev 06:5206:52, 11 October 2024DG Regio talk contribs 86,729 bytes +151 Set a claim value: summary (P836): O âmbito de aplicação material inclui a construção da estrada circular Zator e Podolsz ao longo da estrada provincial n.o 781 como estrada de classe G, uma única faixa de rodagem com duas faixas de rodagem, com um comprimento de cerca de 3 km e viaduto sobre a linha ferroviária e três estruturas de pontes. O início da circular é a junção prevista com a rotunda DW 781 localizada entre a ponte sobre o ribeiro Łowiczanka e os edifícios residenciais ao...

23 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 22:2822:28, 2 March 2023DG Regio talk contribs 83,456 bytes −2,279 Changed label, description and/or aliases in sk, it, hr, ga, et, pt, fi, lt, mt, lv, bg, cs, sl, sv, fr, de, nl, es, hu, da, and other parts

26 October 2022

21 October 2022

10 July 2022

  • curprev 17:5717:57, 10 July 2022DG Regio talk contribs 82,843 bytes +53,432 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

3 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 21:4221:42, 7 July 2021DG Regio talk contribs 14,438 bytes +81 Changed label, description and/or aliases in en: translated_label
  • curprev 21:4221:42, 7 July 2021DG Regio talk contribs 14,357 bytes +2,699 Created claim: summary (P836): The material scope includes the construction of the Zator and Podolsz ring road along provincial road No 781 as a G-class road, a single carriageway with 2 lanes, with a length of approx. 3 km and viaduct over the railway line and three bridge structures. The beginning of the ring road is the planned junction with DW 781 roundabout located between the bridge on the Łowiczanka stream and the residential buildings along DW 781, while the end of th...

21 May 2021