Revision history of "Reconstruction and construction of a power grid with a voltage of SN and NN enabling the connection of electricity generation units from RES in the Limanowski and Thinknicki districts" (Q2708713)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 08:1808:18, 9 October 2024DG Regio talk contribs 97,700 bytes −24 Changed label, description and/or aliases in pt
  • curprev 08:1808:18, 9 October 2024DG Regio talk contribs 97,724 bytes +81 Set a claim value: summary (P836): A execução do projeto assegurará o bom funcionamento das redes de eletricidade em localidades selecionadas dos distritos de Limanowski e Thinknicki, alargando a possibilidade de ligar novas unidades de produção de eletricidade a partir de fontes renováveis em dispersão. Nos municípios onde o projeto está localizado, prevê-se que o número de instalações FER produtoras de eletricidade aumente significativamente. As tarefas consistem principalmente na...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 18:4718:47, 2 March 2023DG Regio talk contribs 92,660 bytes −1,192 Changed label, description and/or aliases in lv, sk, da, ga, it, bg, et, es, ro, fi, sv, lt, sl, fr, mt, pt, hr, de, hu, cs, el, nl, and other parts

26 October 2022

21 October 2022

10 July 2022

  • curprev 17:5517:55, 10 July 2022DG Regio talk contribs 90,963 bytes +58,189 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

20 May 2022

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

3 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 21:3221:32, 7 July 2021DG Regio talk contribs 16,787 bytes +243 Changed label, description and/or aliases in en: translated_label
  • curprev 21:3221:32, 7 July 2021DG Regio talk contribs 16,544 bytes +2,854 Created claim: summary (P836): The implementation of the project will ensure the proper functioning of the electricity networks in selected localities of the Limanowski and Thinknicki districts, extending the possibility of connecting new units of electricity generation from renewable sources in dispersion. In the municipalities where the project is located, the number of RES installations producing electricity is planned to increase significantly. The tasks mainly consist of...

21 May 2021