Revision history of "Modernisation of street lighting in Uścimów Municipality" (Q2706191)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

21 October 2022

10 July 2022

  • curprev 16:5316:53, 10 July 2022DG Regio talk contribs 74,590 bytes +47,805 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:2520:25, 7 July 2021DG Regio talk contribs 12,938 bytes +117 Changed label, description and/or aliases in en: translated_label
  • curprev 20:2520:25, 7 July 2021DG Regio talk contribs 12,821 bytes +2,421 Created claim: summary (P836): Scope of investment: * Dismantling of operated luminaires * Installation of 360 pcs of LED luminaires * Average level of dynamic reduction (resulting from the application of power reduction in luminaires) 30 %. After retrofitting option I LED: Led 32 W – 94 pcs; Led 43 W-107 pcs; Led 50 W -52 pcs; Led 58 W – 40 pcs. 44 LED 71 W – 25 pcs; Led 83 W – 12 pcs; Led 90 W-30 pcs · installation of a comprehensive intelligent lighting control system. Lig...

21 May 2021