Revision history of "Modernisation of street lighting in Ulan-Majorat Municipality" (Q2706180)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 06:5106:51, 11 October 2024DG Regio talk contribs 92,943 bytes +14 Changed label, description and/or aliases in pt
  • curprev 06:5106:51, 11 October 2024DG Regio talk contribs 92,929 bytes +258 Set a claim value: summary (P836): Projection. modern. lighting system in Gm.Ulan-Majorat. on the replacement of 627 pcs. i.e. sodium/mercury luminaires for energoszcz. and based on modern lighting technology (incluindo 551 pcs. booms), with the installation of intelligent lighting management and control system. (Projeção. moderno. sistema de iluminação em Gm.Ulan-Majorat. sobre a substituição de 627 peças, ou seja, luminárias de sódio/mercúrio para energoszcz. e com base na tecnolog...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 23:3823:38, 2 March 2023DG Regio talk contribs 90,624 bytes −818 Changed label, description and/or aliases in bg, cs, da, de, el, es, et, fi, fr, ga, hr, hu, it, lt, lv, mt, nl, pt, ro, sk, sl, sv, and other parts

21 October 2022

28 July 2022

  • curprev 02:1402:14, 28 July 2022DG Regio talk contribs 90,627 bytes +59,574 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:2420:24, 7 July 2021DG Regio talk contribs 13,957 bytes +120 Changed label, description and/or aliases in en: translated_label
  • curprev 20:2420:24, 7 July 2021DG Regio talk contribs 13,837 bytes +2,971 Created claim: summary (P836): Projection. modern. lighting system in Gm.Ulan-Majorat. on the replacement of 627 pcs. i.e. sodium/mercury luminaires for energoszcz. and based on modern lighting technology (including 551 pcs. booms), together with the installation of intelligent lighting management and control system.; there will also be measurement systems (41 kpl.) and compensation systems (51 units); the scope covers 20 localities-according to the LPR sub-areas: Ulan-Majora...

21 May 2021