Revision history of "Improving the energy efficiency of the building at ul. Poniatowski 6A" (Q2706114)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 21:5721:57, 8 October 2024DG Regio talk contribs 46,682 bytes −1 Changed label, description and/or aliases in pt
  • curprev 21:5721:57, 8 October 2024DG Regio talk contribs 46,683 bytes +6 Set a claim value: summary (P836): O objetivo do projeto é melhorar a eficiência energética da empresa. As tarefas específicas do projeto incluem uma opção de projeto ideal com melhorias: 1. Introdução de configurações para a operação da instalação c.o.2. Substituição da iluminação 3. A instalação da instalação fotovoltaica 4. Substituição de uma porta não isolada 5. Instalação de instalação direta de «arrefecimento livre»

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

21 October 2022

10 July 2022

  • curprev 16:5116:51, 10 July 2022DG Regio talk contribs 43,375 bytes +25,450 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:2320:23, 7 July 2021DG Regio talk contribs 10,588 bytes +128 Changed label, description and/or aliases in en: translated_label
  • curprev 20:2320:23, 7 July 2021DG Regio talk contribs 10,460 bytes +1,210 Created claim: summary (P836): The aim of the project is to improve the energy efficiency of the company. Project-specific tasks include an optimal project option with improvements: 1. Introduction of settings for the operation of the c.o.2 installation. Replacement of lighting 3. Installation of photovoltaic installation 4. Replacement of an uninsulated gate 5. Installation of “free-cooling” direct installation, translated_summary

21 May 2021