Revision history of "Improving the economic efficiency of the training and leisure centre “U Błażeja”" (Q2705891)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 06:5106:51, 11 October 2024DG Regio talk contribs 73,151 bytes +19 Set a claim value: summary (P836): O projeto envolve a criação de uma instalação fotovoltaica com uma capacidade de 34,88 kWp no telhado de um edifício localizado em Drzewce Kolonia 67B, 24-150 Nałęczów, Lubelskie Voivodeship, distrito de Puławski. A instalação produzirá eletricidade para efeitos da atividade económica exercida pelo requerente. O excesso de energia não utilizado pelo requerente será fornecido à rede de distribuição (medição líquida vendida ou recebida). Os objetivos...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

3 November 2022

  • curprev 13:2613:26, 3 November 2022DG Regio talk contribs 70,234 bytes +44,303 Changed label, description and/or aliases in ga, da, ro, el, sv, sl, lt, fi, hu, et, bg, sk, mt, cs, lv, pt, hr, nl, fr, de, it, pl, es, and other parts

21 October 2022

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1820:18, 7 July 2021DG Regio talk contribs 12,558 bytes +145 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1820:18, 7 July 2021DG Regio talk contribs 12,413 bytes +2,137 Created claim: summary (P836): The project involves the creation of a photovoltaic installation with a capacity of 34.88 kWp on the roof of a building located in Drzewce Kolonia 67B, 24-150 Nałęczów, Lubelskie Voivodeship, Puławski district. The installation will generate electricity for the purposes of the economic activity carried out by the Applicant. The excess energy unused by the Applicant will be fed to the Distribution Network (sold or received -net metering). The obj...

21 May 2021