Revision history of "Energy from RES in ELEKTRO-LECH enterprise" (Q2705876)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:1221:12, 2 March 2023DG Regio talk contribs 62,141 bytes −844 Changed label, description and/or aliases in da, lv, it, sk, fi, fr, de, hr, et, ro, sv, es, ga, pt, hu, sl, el, bg, lt, cs, nl, mt, and other parts

21 October 2022

10 July 2022

  • curprev 16:4616:46, 10 July 2022DG Regio talk contribs 62,174 bytes +38,967 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1820:18, 7 July 2021DG Regio talk contribs 12,083 bytes +101 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1820:18, 7 July 2021DG Regio talk contribs 11,982 bytes +1,974 Created claim: summary (P836): The implementation of the project will consist of the construction of two photovoltaic installations with a capacity of 18.24 kW and 28.16 kW with the planned use of the energy produced for own use. The installations will be located on the roofs of two buildings located on the property of which the Applicant is the owner (two electricity connections). The project will be implemented in the period from 01.03.2021 to 30.06.2021. The project will r...

21 May 2021