Revision history of "Construction of rooftop and stationary photovoltaic installations in Luta, Orchówek, Włodawa" (Q2705853)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 08:2108:21, 9 October 2024DG Regio talk contribs 91,663 bytes −22 Changed label, description and/or aliases in pt
  • curprev 08:2108:21, 9 October 2024DG Regio talk contribs 91,685 bytes +33 Set a claim value: summary (P836): O projeto tem por objeto a construção de uma instalação fotovoltaica com uma capacidade instalada total de 0,116 MW (116,25 kW) que cubra, em primeiro lugar, as necessidades próprias da empresa em eletricidade, localizada em: 1. GM. Włodawa, masc. Luta, dz n.o 20/2; potência instalada. 21,7 kW; Estacionário 2. GM. Włodawa, masc. Orchówek, dz n.o 650/3; potência instalada. 27,9 kW; cont. do telhado. 3. M. Włodawa, st. Światowida, dz n.o 1220/5; potên...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

3 March 2023

  • curprev 00:4500:45, 3 March 2023DG Regio talk contribs 88,530 bytes −927 Changed label, description and/or aliases in da, it, sk, hr, et, lt, sv, pt, fi, lv, ro, es, hu, fr, el, nl, ga, cs, sl, bg, mt, de, and other parts

21 October 2022

10 July 2022

  • curprev 16:4616:46, 10 July 2022DG Regio talk contribs 88,642 bytes +57,421 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

3 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1820:18, 7 July 2021DG Regio talk contribs 14,893 bytes +153 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1820:18, 7 July 2021DG Regio talk contribs 14,740 bytes +2,907 Created claim: summary (P836): The object of the project is the construction of a photovoltage installation with a total installed capacity of 0,116 MW (116.25 kW) covering first the company’s own needs on electr., located in: 1. GM. Włodawa, masc. Luta, dz No 20/2; power’s installed. 21,7 kW; stationary 2. GM. Włodawa, masc. Orchówek, dz No 650/3; power’s installed. 27.9 kW; roof cont. 3. M. Włodawa, st. Światowida, dz No. 1220/5; power’s installed. 49,6 kW; stationary Const...

21 May 2021