Revision history of "RES in Jabłoń I commune" (Q2705833)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 08:2108:21, 9 October 2024DG Regio talk contribs 85,103 bytes +63 Set a claim value: summary (P836): O projeto tem por objeto a aquisição e instalação de coletores solares, fornos de pellets, caldeiras de gaseificação, bombas aerotérmicas e células fotovoltaicas. O número total de instalações instaladas em objetos privados no município de Jabłoń será de 204 unidades. (capacidade instalada total 0,89 MW). Tipos de instalações individuais: Caldeira da pelota 15 kW -8 PCes.,caldeira da pelota 24 kW - 3 PCes.,caldeira de Holzgas 18 kW- 2 PCes.,coletore...

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:1221:12, 2 March 2023DG Regio talk contribs 82,279 bytes −1,682 Changed label, description and/or aliases in da, sk, hr, et, fi, de, ro, hu, es, el, sv, pt, lv, cs, lt, ga, nl, fr, sl, bg, mt, and other parts

21 October 2022

10 July 2022

  • curprev 16:4516:45, 10 July 2022DG Regio talk contribs 83,145 bytes +54,209 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1720:17, 7 July 2021DG Regio talk contribs 13,621 bytes +84 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1720:17, 7 July 2021DG Regio talk contribs 13,537 bytes +2,771 Created claim: summary (P836): The object of the project is the purchase and installation of solar collectors, pellet furnaces, gasification boilers, aerothermal pumps and photovoltaic cells. The total number of installed installations on private objects in the municipality of Jabłoń will be 204 pcs. (total installed capacity 0,89 MW). Types of individual installations: Pellet boiler 15 kW -8 pcs.,Pellet boiler 24 kW – 3 pcs.,Holzgas boiler 18 kW- 2 pcs., Solar collectors 2 p...

21 May 2021