Revision history of "NEW ENERGY FOR KRAŚNIK III" (Q2705831)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

6 July 2023

12 June 2023

24 May 2023

2 March 2023

21 October 2022

10 July 2022

  • curprev 16:4516:45, 10 July 2022DG Regio talk contribs 74,052 bytes +47,656 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1720:17, 7 July 2021DG Regio talk contribs 12,886 bytes +86 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1720:17, 7 July 2021DG Regio talk contribs 12,800 bytes +2,322 Created claim: summary (P836): The project involves the installation of 266 RES installations: — 209 photovoltaic installations [3.1 kW] with a total capacity of 0.648 MW on the roofs and facades of residential buildings, – 51 solar installations of 3.4 kW and 5.1 kW (with a total capacity of 0.241 MW) on the roofs and facades of residential buildings, – 6 biomass stoves – pellets with a capacity of 20 kW and 25 kW (with a total capacity of 0.125 MW) in residential buildings,...

21 May 2021