Revision history of "Renewable energy in the municipality of Drelów – stage II" (Q2705821)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:1221:12, 2 March 2023DG Regio talk contribs 85,446 bytes −1,025 Changed label, description and/or aliases in da, it, sk, lv, fi, sl, et, hr, el, ro, sv, cs, fr, hu, lt, pt, ga, de, bg, mt, and other parts

21 October 2022

28 July 2022

  • curprev 02:1102:11, 28 July 2022DG Regio talk contribs 85,659 bytes +55,680 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1720:17, 7 July 2021DG Regio talk contribs 13,778 bytes +119 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1720:17, 7 July 2021DG Regio talk contribs 13,659 bytes +2,886 Created claim: summary (P836): The object of the project is the purchase and installation of solar collectors, biomass stoves, aerothermal pumps and photovoltaic cells. The total number of installed installations on private facilities in the Municipality of Drelów will be 469 pcs. (total installed capacity 2.6 MW). Types of individual installations: boilers with a power of 15 kW – 18 units, boilers with a power of 20 kW – 33 pcs, boilers with a power of 25 kW – 13 units; 2-pa...

21 May 2021