Revision history of "RES in the municipality of Sosnówka" (Q2705817)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 20:5420:54, 9 October 2024DG Regio talk contribs 88,583 bytes +4 Changed label, description and/or aliases in pt
  • curprev 20:5420:54, 9 October 2024DG Regio talk contribs 88,579 bytes +6 Set a claim value: summary (P836): O projeto tem por objeto a aquisição e instalação de coletores solares, células fotovoltaicas, caldeiras a biomassa e caldeiras de gaseificação de madeira nos edifícios privados acima referidos no município de Sosnówka (106 instalações com uma capacidade total instalada de 0,68 MW). Tipos de instalações individuais no projeto: Colectores de dois painéis (3,1 kW) – 26 peças; Colectores de 3 painéis (potência de 4,65 kW) – 12 unidades, caldeiras de bi...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

21 October 2022

10 July 2022

  • curprev 16:4516:45, 10 July 2022DG Regio talk contribs 86,563 bytes +56,322 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1720:17, 7 July 2021DG Regio talk contribs 13,802 bytes +95 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1720:17, 7 July 2021DG Regio talk contribs 13,707 bytes +2,889 Created claim: summary (P836): The object of the project is the purchase and installation of solar collectors, photovoltaic cells, biomass boilers and wood gasifying boilers in the above-mentioned private buildings in the municipality of Sosnówka (106 installations with a total installed capacity of 0.68 MW). Types of individual installations in the project: 2-panel collectors (3,1 kW) – 26 pieces; 3-panel collectors (power 4.65 kW) – 12 units, biomass boilers 20 kW – 7 units...

21 May 2021