Revision history of "Renewable energy for Wojcieszków Municipality – stage 2" (Q2705810)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:1221:12, 2 March 2023DG Regio talk contribs 87,679 bytes −1,016 Changed label, description and/or aliases in da, it, sk, et, lv, hr, cs, fi, ro, fr, hu, lt, pt, es, ga, sv, mt, sl, el, nl, bg, and other parts

20 October 2022

10 July 2022

  • curprev 16:4416:44, 10 July 2022DG Regio talk contribs 87,881 bytes +57,154 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1720:17, 7 July 2021DG Regio talk contribs 13,803 bytes +117 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1720:17, 7 July 2021DG Regio talk contribs 13,686 bytes +2,924 Created claim: summary (P836): The object of the project is the purchase and installation of Renewable Energy Sources on residential buildings of individual consumers/residents. Types and Powers: The power of the installed installations will be: solar installations 240 units with a total capacity of 0.76 MW(165 installations with a capacity of 2,72 kW, 70 installations with a capacity of 4.08kw – roof mounted, 5 installations with a capacity of 5.44 kw – mounted on the roof);...

21 May 2021