Revision history of "SOLAR GARBS – STAGE II" (Q2705774)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 18:4718:47, 7 October 2024DG Regio talk contribs 88,120 bytes −6 Changed label, description and/or aliases in pt
  • curprev 18:4718:47, 7 October 2024DG Regio talk contribs 88,126 bytes −42 Set a claim value: summary (P836): O projeto envolve a aquisição e instalação de 222 instalações FER: — 198 fotovolts com uma capacidade total de 0,614 MW por edifício de apartamentos do município (em modo de funcionamento em rede), — 24 fogões a biomassa (com uma capacidade total de 0,505 MW) em edifícios residenciais de residentes do município, destinados à UTC e à produção de eletricidade (apenas para fins sociais e residenciais). P. previu também a conceção e execução do portal d...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:1221:12, 2 March 2023DG Regio talk contribs 85,407 bytes +1,618 Changed label, description and/or aliases in lv, it, da, sk, el, pt, ro, fi, fr, et, hr, sv, ga, sl, lt, de, hu, bg, nl, es, mt, cs, and other parts

20 October 2022

28 July 2022

  • curprev 02:1002:10, 28 July 2022DG Regio talk contribs 82,971 bytes +54,034 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1620:16, 7 July 2021DG Regio talk contribs 13,510 bytes +83 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1620:16, 7 July 2021DG Regio talk contribs 13,427 bytes +2,723 Created claim: summary (P836): The project involves the purchase and installation of 222 RES installations: — 198 photovolts with a total capacity of 0.614 MW per commune’s apartment building (on grid working mode), – 24 biomass stoves (with a total capacity of 0.505 MW) in residential buildings of residents of the municipality, intended for CWU and electricity production (for social and residential purposes only). P. predicted also the design and execution of the Internet po...

21 May 2021