Revision history of "Eco-Energy for the Municipality of Stanin – stage IV" (Q2705770)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 October 2022

27 September 2022

28 July 2022

  • curprev 02:1002:10, 28 July 2022DG Regio talk contribs 81,193 bytes +52,666 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1620:16, 7 July 2021DG Regio talk contribs 13,288 bytes +113 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1620:16, 7 July 2021DG Regio talk contribs 13,175 bytes +2,639 Created claim: summary (P836): The subject of the project is the purchase and installation of Renewable Energy Sources. Types and Powers: solar installations 144 units with a total capacity of 0.6 MW; heat pumps.-19 units with a total capacity of 0.05 MW, biomass boilers 38 pcs with a total power of 0.76 MW, photovoltaic panels.130 units with a total capacity of 0.39 MW. The total capacity of installed installations is 1.8 MW The need is to increase the share of RES in the fu...

21 May 2021