Revision history of "IMPROVING ENERGY EFFICIENCY THROUGH PURCHASE AND INSTALLATION OF PHOTOVOLTAIC CELLS IN OSTRÓWEK MUNICIPALITY" (Q2705757)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 06:5106:51, 11 October 2024DG Regio talk contribs 88,164 bytes +6 Changed label, description and/or aliases in pt
  • curprev 06:5106:51, 11 October 2024DG Regio talk contribs 88,158 bytes −57 Set a claim value: summary (P836): O projecto envolve a instalação de 61 instalações fotovoltaicas (24 pcs. — 3 kW cada, 37 unidades. — 4,2 kW — capacidade total de 0,23 MW) montados em telhados, fachadas de edifícios residenciais e comerciais e, na ausência de capacidade técnica, também no solo (as instalações no solo não excederão 3 m) dos habitantes do município de Ostrówek (O). P. previu também a conceção e execução do portal Internet, que desempenhará as funções de educação, pro...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:1221:12, 2 March 2023DG Regio talk contribs 85,455 bytes +1,081 Changed label, description and/or aliases in lv, it, da, sk, ga, cs, bg, et, ro, fi, mt, sv, nl, pt, hr, sl, lt, el, fr, hu, de, and other parts

20 October 2022

10 July 2022

  • curprev 16:4316:43, 10 July 2022DG Regio talk contribs 83,556 bytes +54,400 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1620:16, 7 July 2021DG Regio talk contribs 13,583 bytes +169 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1620:16, 7 July 2021DG Regio talk contribs 13,414 bytes +2,668 Created claim: summary (P836): The project involves the installation of 61 photovoltaic installations (24 pcs. — 3 kW each, 37 pcs. — 4,2 kW – total capacity of 0,23 MW) mounted on roofs, facades of residential and commercial buildings and, in the absence of technical capacity, also on the ground (the installations on the ground will not exceed 3 m) of the inhabitants of Ostrówek municipality (O). P. predicted also the design and execution of the Internet portal, which will p...

21 May 2021