Revision history of "Eco Szczebrzeszyn heat in the rays of the sun – stage II" (Q2705753)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 18:4518:45, 2 March 2023DG Regio talk contribs 64,794 bytes +758 Changed label, description and/or aliases in lv, da, it, sk, fr, sl, hr, fi, sv, ga, de, ro, lt, et, hu, es, mt, el, cs, bg, pt, nl, and other parts

3 November 2022

  • curprev 13:2613:26, 3 November 2022DG Regio talk contribs 64,036 bytes +40,075 Changed label, description and/or aliases in ga, et, da, ro, el, sv, sl, lt, fi, hu, bg, sk, mt, cs, lv, pt, hr, nl, fr, de, it, pl, es, and other parts

20 October 2022

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1620:16, 7 July 2021DG Regio talk contribs 12,029 bytes +117 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1620:16, 7 July 2021DG Regio talk contribs 11,912 bytes +1,879 Created claim: summary (P836): The project involves the installation of 492 solar installations (with power: 3.2 kW and 4.8 kW) on the roofs and facades of residential buildings in the commune of Szczebrzeszyn and 1 pcs of photovoltaic installation 4.0 kW on the roof of the Rural Culture Club in Kawęczyn (plot no. 188) and the creation of a web portal with the ICT-ICT system. INDICATORS: Additional power generation capacity from RES – 1,732 MW; Additional renewable electricit...

21 May 2021