Revision history of "Biomass and sun energy for the municipality of Markuszów" (Q2705746)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:1221:12, 2 March 2023DG Regio talk contribs 79,646 bytes +213 Changed label, description and/or aliases in lv, it, da, sk, et, fi, fr, ga, ro, sv, el, bg, hu, de, cs, sl, mt, es, pt, lt, hr, nl, and other parts

20 October 2022

28 July 2022

  • curprev 02:1002:10, 28 July 2022DG Regio talk contribs 78,614 bytes +50,937 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 20:1520:15, 7 July 2021DG Regio talk contribs 13,180 bytes +116 Changed label, description and/or aliases in en: translated_label
  • curprev 20:1520:15, 7 July 2021DG Regio talk contribs 13,064 bytes +2,538 Created claim: summary (P836): The project involves the installation of 26 photovoltaic installations (with a total capacity of 0.08 MW) and 4 biomass boilers (pelet) (with a total capacity of 0.07 MW) on roofs, facades of residential and commercial buildings and, in the absence of technical possibilities, also on the ground (the installations on the ground will not exceed the height of 3 m) and inside the buildings of the residents of the municipality of Markuszów, the imple...

21 May 2021