Revision history of "Thermomodernisation of public buildings and residential buildings in Wartkowice Municipality" (Q2702322)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 18:4318:43, 7 October 2024DG Regio talk contribs 81,310 bytes +18 Changed label, description and/or aliases in pt
  • curprev 18:4318:43, 7 October 2024DG Regio talk contribs 81,292 bytes −40 Set a claim value: summary (P836): No âmbito dos trabalhos preparatórios, foram realizadas auditorias energéticas aos edifícios, um estudo de viabilidade do projecto e do PFU. Está igualmente prevista a realização de uma documentação de projecto, que será efectuada pelo principal contratante dos trabalhos de construção. PLANOS DE PROJETO PARA SUPERVISÃO DO INVESTIMENTO. E PROMOÇÕES DO PROJECTO. OS TRABALHOS DE TEMODORNIZAÇÃO INCLUIRAM: INSULAÇÃO DE PAINÉIS, PAVIMENTOS E ROOFS, SUBSTI...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:0321:03, 2 March 2023DG Regio talk contribs 78,514 bytes +1,717 Changed label, description and/or aliases in it, da, sk, el, fi, ro, de, cs, bg, lv, ga, lt, fr, es, hu, pt, et, sl, mt, nl, hr, and other parts

19 October 2022

10 July 2022

  • curprev 15:3415:34, 10 July 2022DG Regio talk contribs 75,981 bytes +48,730 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 18:3818:38, 7 July 2021DG Regio talk contribs 13,156 bytes +151 Changed label, description and/or aliases in en: translated_label
  • curprev 18:3818:38, 7 July 2021DG Regio talk contribs 13,005 bytes +2,447 Created claim: summary (P836): AS PART OF THE PREPARATORY WORK, ENERGY AUDITS OF BUILDINGS, A FEASIBILITY STUDY OF THE PROJECT AND THE PFU WERE CARRIED OUT. IT IS ALSO PLANNED TO CARRY OUT DESIGN DOCUMENTATION, WHICH WILL BE CARRIED OUT BY THE MAIN CONTRACTOR OF THE CONSTRUCTION WORKS. THE PROJECT PLANS TO SUPERVISE THE INVESTMENT. AND PROMOTIONS OF THE PROJECT. THERMOMODERNISATION WORKS INCLUDE: INSULATION OF WALLS, FLOORS AND ROOFS, REPLACEMENT OF WINDOW AND DOOR JOINERY, M...

21 May 2021