Revision history of "Socio-professional activation in Strzelce Krajeńskie Municipality" (Q2699920)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 07:4707:47, 10 October 2024DG Regio talk contribs 71,474 bytes −36 Set a claim value: summary (P836): O principal objetivo do projeto é a ativação socioprofissional de 40 pessoas em risco de pobreza ou exclusão social. (33K, 7M) no município de Strzelce Krajeńskie durante o período de 1.4.2021-31.3.2023, o que conduziu a um aumento da empregabilidade dos projetos apoiados. O projeto prevê a realização das seguintes tarefas: — ativação para um total de 40 pessoas (33K, 7M), incluindo 5 OzN (4K, 1M) no período de 1.4.2021 a 31.3.2023, através, nomeada...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

20 October 2022

28 July 2022

  • curprev 01:2001:20, 28 July 2022DG Regio talk contribs 66,203 bytes +41,895 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:3617:36, 7 July 2021DG Regio talk contribs 12,249 bytes +125 Changed label, description and/or aliases in en: translated_label
  • curprev 17:3617:36, 7 July 2021DG Regio talk contribs 12,124 bytes +2,068 Created claim: summary (P836): The main objective of the project is the socio-occupational activation of 40 people at risk of poverty or social exclusion. (33K, 7M) in the municipality of Strzelce Krajeńskie during the period 01.04.02021-31.03.2023 leading to an increase in the employability of the supported projects. The project plans to carry out the tasks: — activation for a total of 40 people (33K, 7M), including 5 OzN (4K, 1M) in the period 1.04.2021-31.03.2023 through,...

21 May 2021