Revision history of "1 MW SOLAR PARK IN SUŁOWIE" (Q2699837)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 07:4707:47, 10 October 2024DG Regio talk contribs 48,994 bytes +1 Changed label, description and/or aliases in pt
  • curprev 07:4707:47, 10 October 2024DG Regio talk contribs 48,993 bytes −38 Set a claim value: summary (P836): Projeto: O Parque Solar de 1 MW em Sułowie consiste na construção de uma central fotovoltaica com uma capacidade elétrica total instalada de 990,66 kWp num terreno com o número de registo 82/1 (intervalo 5) em Sułowie. A central solar será composta por um total de 2678 módulos fotovoltaicos e 7 inversores. A quantidade prevista de eletricidade produzida durante o ano na central fotovoltaica será de: 1000 MWh. As emissões de CO2 evitadas serão: 770,2...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:0121:01, 2 March 2023DG Regio talk contribs 46,270 bytes +783 Changed label, description and/or aliases in lv, da, it, sk, fi, fr, et, ga, sv, ro, pt, es, de, hu, bg, el, sl, cs, hr, lt, nl, mt, and other parts

21 October 2022

10 July 2022

  • curprev 14:4614:46, 10 July 2022DG Regio talk contribs 44,673 bytes +26,432 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 10,654 bytes +86 Changed label, description and/or aliases in en: translated_label
  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 10,568 bytes +1,296 Created claim: summary (P836): Project: The 1 MW Solar Park in Sułowie consists of the construction of a photovoltaic power plant with a total installed electrical capacity of 990.66 kWp on a plot with registration number 82/1 (range 5) in Sułowie. The solar power plant will consist of a total of 2678 photovoltaic modules and 7 inverters. The projected amount of electricity produced during the year at the PV power plant will be: 1000 MWh. The avoided CO2 emissions will be: 77...

21 May 2021