Revision history of "Construction of a photovoltaic installation up to 1 MW with the necessary infrastructure in Grabów" (Q2699830)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 20:5120:51, 9 October 2024DG Regio talk contribs 92,027 bytes −34 Changed label, description and/or aliases in pt
  • curprev 20:5120:51, 9 October 2024DG Regio talk contribs 92,061 bytes −173 Set a claim value: summary (P836): O investimento consiste na construção de uma instalação fotovoltaica com uma capacidade máxima de 1 MW (998,40 kWp), juntamente com a infraestrutura de acompanhamento. A eletricidade produzida será fornecida à rede elétrica, de acordo com as condições técnicas de ligação à rede elétrica. O principal objetivo do projeto é aumentar a quota de eletricidade produzida a partir de FER e aumentar a segurança energética e reduzir as emissões de gases com ef...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:4016:40, 2 March 2023DG Regio talk contribs 89,473 bytes +4,001 Changed label, description and/or aliases in lv, it, da, sk, bg, fr, hu, el, cs, ga, es, ro, et, fi, de, pt, sv, hr, lt, sl, nl, mt, and other parts

21 October 2022

28 July 2022

  • curprev 01:2001:20, 28 July 2022DG Regio talk contribs 84,661 bytes +54,991 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 13,855 bytes +158 Changed label, description and/or aliases in en: translated_label
  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 13,697 bytes +2,741 Created claim: summary (P836): The investment consists of the construction of a photovoltaic installation with a maximum capacity of up to 1 MW (998,40 kWp) together with accompanying infrastructure. The electricity produced will be supplied to the electricity grid, in accordance with the technical conditions for connection to the electricity grid. The main objective of the project is to increase the share of electricity from RES and to increase energy security, reduce greenh...

21 May 2021