Revision history of "Construction of Radnica 1 photovoltaic farm with peak power of 999.68 kWp" (Q2699826)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

21 October 2022

28 July 2022

  • curprev 01:2001:20, 28 July 2022DG Regio talk contribs 90,342 bytes +59,158 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 13,997 bytes +132 Changed label, description and/or aliases in en: translated_label
  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 13,865 bytes +3,021 Created claim: summary (P836): The aim of the project is to increase the production of electr. from sources of renewable energy-solar energy through the construction of a photovoltaic farm in Lubuskie Province. As a result of the investment, more efficient technology will be implemented for the energet system, based on RES. Installation of RES installations will allow to reduce emissions into the atmosphere of harmful substances and substances, which will improve the conditio...

21 May 2021