Revision history of "Lubuski Photovoltaic Operator" (Q2699825)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 20:5120:51, 9 October 2024DG Regio talk contribs 89,609 bytes 0 Changed label, description and/or aliases in pt
  • curprev 20:5120:51, 9 October 2024DG Regio talk contribs 89,609 bytes −111 Set a claim value: summary (P836): O projeto diz respeito à construção de 10 instalações fotovoltaicas distribuídas em 3 municípios com uma capacidade total de 338,7 kW, incluindo: 1)Comuna de Czerwieńsk: INST. 49,8 kW na estação de tratamento de águas residuais de Czerwieńsk, 2) Município de Iłowa: INST. 25,8 kW nas instalações da SUW em Szczepanów, inst. 25,8 kW nas instalações da SUW em Iłowa, inst. 40,5 kW na estação de tratamento de águas residuais de Iłowa, inst. 19,8 kW na fáb...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

21 October 2022

10 July 2022

  • curprev 14:4514:45, 10 July 2022DG Regio talk contribs 81,724 bytes +51,793 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 14,589 bytes +88 Changed label, description and/or aliases in en: translated_label
  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 14,501 bytes +2,794 Created claim: summary (P836): The project concerns the construction of 10 distributed photovoltaic installations in 3 Municipalities with a total capacity of 338.7 kW, including: 1)Commune of Czerwieńsk: INST. 49.8 kW at the sewage treatment plant in Czerwieńsk, 2) Iłowa Municipality: INST. 25.8 kW at the SUW facility in Szczepanów, inst. 25.8 kW on the SUW facility in Iłowa, inst. 40.5 kW at the sewage treatment plant in Iłowa, inst. 19.8 kW at the PS1 plant in Iłowa, inst....

21 May 2021