Revision history of "Construction of a 2 MW photovoltaic farm on plot 279/3 located within Jasieniec" (Q2699822)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 08:1308:13, 9 October 2024DG Regio talk contribs 80,471 bytes +15 Set a claim value: summary (P836): O projeto previsto consistirá na construção de uma exploração fotovoltaica com uma capacidade máxima de 2 MW. Esta opção envolve a construção de uma exploração fotovoltaica, que prevê a instalação de painéis fotovoltaicos, juntamente com as infraestruturas elétricas necessárias. Os painéis serão montados numa estrutura metálica de aço ancorada no solo e, em seguida, a instalação será ligada à rede elétrica. Devido ao investimento previsto, o atual m...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:0121:01, 2 March 2023DG Regio talk contribs 77,696 bytes +41 Changed label, description and/or aliases in da, it, es, sk, cs, sv, bg, lt, de, fi, hr, ga, et, el, lv, pt, ro, fr, hu, sl, nl, mt, and other parts

21 October 2022

10 July 2022

  • curprev 14:4514:45, 10 July 2022DG Regio talk contribs 76,838 bytes +49,141 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 13,308 bytes +138 Changed label, description and/or aliases in en: translated_label
  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 13,170 bytes +2,525 Created claim: summary (P836): The planned project will consist of the construction of a photovoltaic farm with a capacity of up to 2 MW. This option involves the construction of a photovoltaic farm, which plans to plant photovoltaic panels, together with the necessary electricity infrastructure. The panels will be mounted on a metal steel structure anchored in the ground, then – the installation will be connected to the electrical network. Due to the planned investment, the...

21 May 2021