Revision history of "EPV Power Plant Podmokle Wielkie 2 MW dz. Nos 131/1 and 131/3" (Q2699819)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 21:5721:57, 8 October 2024DG Regio talk contribs 89,190 bytes −12 Changed label, description and/or aliases in pt
  • curprev 21:5721:57, 8 October 2024DG Regio talk contribs 89,202 bytes −28 Set a claim value: summary (P836): O eixo do projeto é a construção de uma exploração fotovoltaica Podmokle Wielkie (município de Babimost) com uma capacidade de 1 999 968 MWp. Estruturas de apoio, painéis fotovoltaicos, inversores, instalações elétricas, cablagem e proteção contra sobretensões, estação de transformação e ligação à rede de distribuição serão construídas/montadas. O sistema de monitorização e gestão da energia, o dispositivo de medição da poluição atmosférica, a vedaç...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:0121:01, 2 March 2023DG Regio talk contribs 86,469 bytes +442 Changed label, description and/or aliases in da, it, sk, cs, ro, fi, lv, de, bg, sv, ga, lt, el, sl, es, et, fr, mt, pt, nl, hr, hu, and other parts

21 October 2022

28 July 2022

  • curprev 01:2001:20, 28 July 2022DG Regio talk contribs 85,209 bytes +55,399 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 13,723 bytes +120 Changed label, description and/or aliases in en: translated_label
  • curprev 17:3417:34, 7 July 2021DG Regio talk contribs 13,603 bytes +2,696 Created claim: summary (P836): The axis of the project is the construction of a photovoltaic farm Podmokle Wielkie (municipality of Babimost) with a capacity of 1,99968 MWp. Support structures, PV panels, inverters, electrical installations, wiring and surge protection, transformer station and distribution network connection will be built/mounted. A complementary role will be played by the energy monitoring and management system, air pollution measuring device, fence, video m...

21 May 2021