Revision history of "Thermomodernisation and reconstruction of the building at ul. Kcyńska 34 in Szubin" (Q2699199)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 19:2019:20, 10 October 2024DG Regio talk contribs 65,203 bytes −15 Set a claim value: summary (P836): O objetivo do investimento é a termomodernização e reconstrução da parte central do edifício público existente em Szubin, ul. Kcyńska 34 com a reatribuição de funções aos escritórios da Câmara Municipal de Szubin. O edifício é um edifício de três andares com um quarto andar coberto com um telhado plano. O âmbito do trabalho foi adotado a partir da auditoria energética, após análise de muitas variantes, com base na documentação técnica, nas condições...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

21 October 2022

10 July 2022

  • curprev 14:3214:32, 10 July 2022DG Regio talk contribs 61,894 bytes +38,641 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:2017:20, 7 July 2021DG Regio talk contribs 12,023 bytes +142 Changed label, description and/or aliases in en: translated_label
  • curprev 17:2017:20, 7 July 2021DG Regio talk contribs 11,881 bytes +1,968 Created claim: summary (P836): The object of the investment is thermomodernisation and reconstruction of the central part of the existing public building in Szubin, ul. Kcyńska 34 with the reassignment of functions to offices for the City Hall in Szubin. The building is a three-storey building with a fourth floor covered with a flat roof. The scope of the work was adopted from the energy audit, after analysing many variants, based on technical documentation, the technical con...

21 May 2021