Revision history of "Cycle paths in Chelmiński – stage II" (Q2699173)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:5920:59, 2 March 2023DG Regio talk contribs 83,798 bytes −1,086 Changed label, description and/or aliases in da, it, et, sk, fi, hr, es, lt, hu, ro, fr, ga, pt, lv, sv, bg, nl, el, de, sl, cs, mt, and other parts

21 October 2022

10 July 2022

  • curprev 14:3114:31, 10 July 2022DG Regio talk contribs 84,058 bytes +53,996 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

3 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:2017:20, 7 July 2021DG Regio talk contribs 14,702 bytes +98 Changed label, description and/or aliases in en: translated_label
  • curprev 17:2017:20, 7 July 2021DG Regio talk contribs 14,604 bytes +2,844 Created claim: summary (P836): The project concerns the construction of two sections of the pieszo-rowerowej:Odcinek I; Chełmno – Unisław with a length of 11.77 km from km 3+ 000 to km 14 + 775 along district roads No 1604C, No 1607C and No 1627C from Watorowo through Dorposz Szlachecki to Unisław,Section II, Dorposz Szlachecki – Royal Kyiv with a length of 2.23 km along district road No 1604C from Dorposz Szlachecki to the village of Kijewo Royale. Both sections forming the...

21 May 2021