Revision history of "Construction of RES installations on residential buildings in Golub City – Dobrzyń" (Q2699111)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 18:3118:31, 7 October 2024DG Regio talk contribs 83,226 bytes 0 Changed label, description and/or aliases in pt
  • curprev 18:3118:31, 7 October 2024DG Regio talk contribs 83,226 bytes +20 Set a claim value: summary (P836): O projeto consistirá na construção de instalações fotovoltaicas para 10 edifícios residenciais privados em Golub – cidade de Dobrzyń. O principal objetivo do projeto é «Aumentar a quota de energias renováveis no voivodato através da instalação de 10 instalações fotovoltaicas na cidade de Golub-Dobrzyń». Atualmente, estão a ser desenvolvidos planos de investimento. As células fotovoltaicas serão fixadas em telhados e no solo. A altura total da estrut...

7 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:5920:59, 2 March 2023DG Regio talk contribs 80,445 bytes +1,164 Changed label, description and/or aliases in da, it, sk, ro, fi, cs, lv, de, bg, sv, ga, lt, el, es, sl, fr, et, mt, pt, nl, hu, hr, and other parts

21 October 2022

10 July 2022

  • curprev 14:3014:30, 10 July 2022DG Regio talk contribs 78,447 bytes +50,790 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:1917:19, 7 July 2021DG Regio talk contribs 13,224 bytes +144 Changed label, description and/or aliases in en: translated_label
  • curprev 17:1917:19, 7 July 2021DG Regio talk contribs 13,080 bytes +2,463 Created claim: summary (P836): The project will consist of the construction of photovoltaic installations for 10 private residential buildings in Golub – Dobrzyń City. The main objective of the project is “Increasing the share of renewable energy in the voivodship by installing 10 photovoltaic installations in the City of Golub-Dobrzyń”. Currently, investment plots are being developed. Photovoltaic cells will be fixed on roofs and on the ground. The total height of the struct...

21 May 2021