Revision history of "Construction of a system for collecting and retaining rainwater through the construction of reservoirs, retention and drainage and rain drainage along with accompanying infrastructure on the Polesie estate in Lubin" (Q2698564)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 20:5020:50, 9 October 2024DG Regio talk contribs 90,116 bytes −9 Changed label, description and/or aliases in pt
  • curprev 20:5020:50, 9 October 2024DG Regio talk contribs 90,125 bytes +62 Set a claim value: summary (P836): O objecto do projecto é a construção de um sistema integrado de recolha e gestão de águas pluviais através da construção de um sistema de drenagem de águas pluviais com infra-estruturas de acompanhamento, 1 reservatório e 2 tanques de retenção e drenagem com um volume de 760 m3. Ninguém cobre a recém-concebida propriedade Polesie em Lubin. A execução do projeto permitirá a recolha, retenção e gestão das águas pluviais da zona. 8,4 ha. O projeto incl...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:3422:34, 2 March 2023DG Regio talk contribs 87,243 bytes −1,424 Changed label, description and/or aliases in da, it, sk, ga, et, mt, bg, lv, cs, lt, fi, pt, fr, de, ro, el, sl, es, sv, nl, hu, hr, and other parts

21 October 2022

10 July 2022

  • curprev 14:1814:18, 10 July 2022DG Regio talk contribs 87,848 bytes +57,177 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 17:0117:01, 7 July 2021DG Regio talk contribs 14,071 bytes +274 Changed label, description and/or aliases in en: translated_label
  • curprev 17:0117:01, 7 July 2021DG Regio talk contribs 13,797 bytes +2,765 Created claim: summary (P836): The object of the project is the construction of an integrated system for the collection and management of rainwater through the construction of a rainwater drainage system with accompanying infrastructure, 1 reservoir and 2 retention and drainage tanks with a volume of 760 m³. No one covers the newly designed Polesie estate in Lubin. Implementation of the project will enable the collection, retention and management of rainwater from the area. 8...

21 May 2021