Revision history of "Technical Assistance to the Centre for European Projects 2021-2022." (Q2696417)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 21:5321:53, 8 October 2024DG Regio talk contribs 47,175 bytes −23 Changed label, description and/or aliases in pt
  • curprev 21:5321:53, 8 October 2024DG Regio talk contribs 47,198 bytes 0 Set a claim value: summary (P836): Assegurar um apoio eficaz à execução do PO KED pelo Centro de Projetos Europeus enquanto organismo intermédio para o eixo prioritário IV, ação 4.3, através de: assegurar uma capacidade institucional adequada (remuneração do pessoal, equipamento de trabalho, formação, custos institucionais) e assegurar a seleção, o controlo, o acompanhamento, a avaliação e a promoção adequados dos projetos.

22 March 2024

6 July 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 20:5320:53, 2 March 2023DG Regio talk contribs 45,519 bytes +952 Changed label, description and/or aliases in da, it, sk, sv, el, fi, et, cs, ga, fr, bg, lv, hu, ro, pt, lt, hr, de, es, mt, nl, sl, and other parts

26 October 2022

19 October 2022

10 July 2022

  • curprev 13:3513:35, 10 July 2022DG Regio talk contribs 42,482 bytes +25,591 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

25 July 2021

7 July 2021

  • curprev 16:1116:11, 7 July 2021DG Regio talk contribs 9,623 bytes +126 Changed label, description and/or aliases in en: translated_label
  • curprev 16:1116:11, 7 July 2021DG Regio talk contribs 9,497 bytes +1,173 Created claim: summary (P836): Ensuring effective support for the implementation of the OP KED by the Centre for European Projects as the Intermediate Body for Priority Axis IV, Action 4.3 through: ensure adequate institutional capacity (staff remuneration, job equipment, training, institution costs) and ensure proper project selection, control, monitoring, evaluation, promotion., translated_summary

21 May 2021