Revision history of "Public Internet for everyone in Bytoń Municipality" (Q2693130)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 20:5020:50, 9 October 2024DG Regio talk contribs 85,820 bytes +119 Set a claim value: summary (P836): O projeto previa a instalação de uma rede Wi-Fi pública completamente nova entre 1.1.2022 e 30.9.2022. O período de execução do projeto resulta do diagnóstico realizado pelo município de Bytoń antes da apresentação do pedido de financiamento. A execução do projeto contribuirá para a realização do objetivo específico 1 do PO PC para o período 2014-2020 – «Eliminar as diferenças territoriais nas oportunidades de acesso à Internet de banda larga de ele...

23 March 2024

15 January 2024

11 June 2023

24 May 2023

2 March 2023

23 October 2022

28 July 2022

  • curprev 00:2400:24, 28 July 2022DG Regio talk contribs 82,936 bytes +53,833 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

17 December 2021

14 December 2021

3 December 2021

21 September 2021

25 July 2021

7 July 2021

  • curprev 15:0015:00, 7 July 2021DG Regio talk contribs 13,716 bytes +110 Changed label, description and/or aliases in en: translated_label
  • curprev 15:0015:00, 7 July 2021DG Regio talk contribs 13,606 bytes +2,758 Created claim: summary (P836): The project planned to install a completely new public Wi-Fi network between 01.01.2022 and 30.09.2022. The period of implementation of the project results from the diagnosis carried out by the Municipality of Bytoń before submitting the application for funding.The implementation of the project will contribute to the achievement of specific objective 1 of the PC OP for the period 2014-2020 – “To eliminate territorial differences in high-speed br...

21 May 2021

20 May 2021