Revision history of "Purchase of new electric buses with the necessary charging infrastructure" (Q2693043)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 18:2118:21, 7 October 2024DG Regio talk contribs 61,640 bytes +12 Set a claim value: summary (P836): O projeto envolve a aquisição de um total de 5 autocarros elétricos, equipados com um pantógrafo e módulo de potência plug-in, com uma bateria com uma capacidade de 120 kWh, para eletrificação e serviço abrangente da linha n.o 5 em Piła. O custo estimado da aquisição de uma unidade de material circulante é de 2,1 milhões de PLN líquidos para um veículo com nível nulo de emissões (custo elegível). O projeto também envolve a compra e instalação do cir...

22 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

24 October 2022

10 July 2022

  • curprev 12:2912:29, 10 July 2022DG Regio talk contribs 58,082 bytes +36,516 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

17 December 2021

14 December 2021

3 December 2021

21 September 2021

25 July 2021

7 July 2021

  • curprev 14:5714:57, 7 July 2021DG Regio talk contribs 11,237 bytes +132 Changed label, description and/or aliases in en: translated_label
  • curprev 14:5714:57, 7 July 2021DG Regio talk contribs 11,105 bytes +1,743 Created claim: summary (P836): The project involves the purchase of a total of 5 electric buses, equipped with a pantograph and plug-in power module, with a battery with a capacity of 120 kWh, for electrification and comprehensive service of line No. 5 in Piła. The estimated cost of purchasing a rolling stock unit is PLN 2.1 million net for one zero-emission vehicle (eligible cost). The project also involves the purchase and installation of the loop at ul. Kossaka fast chargi...

21 May 2021

20 May 2021