Revision history of "Construction of the A1 motorway, the end of the Czestochowa – Tuszyn ring road" (Q2693001)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 20:5020:50, 9 October 2024DG Regio talk contribs 59,800 bytes −17 Changed label, description and/or aliases in pt
  • curprev 20:5020:50, 9 October 2024DG Regio talk contribs 59,817 bytes +11 Set a claim value: summary (P836): O projeto visa construir a autoestrada A1, o fim da estrada circular entre Czestochowa e Tuszyn. 80,71 km, localizado no corredor da rede principal RTE-T Báltico – Adriático. Administrativamente, o investimento está localizado em dois voivodatos: Łódzkie (63,81 km) e Silésia (16,91 km). O investimento será realizado segundo a fórmula P&B, que consiste nas seguintes secções, realizadas sob a forma de contratos separados para obras de construção: • Se...

12 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 18:5418:54, 2 March 2023DG Regio talk contribs 57,040 bytes −2,661 Changed label, description and/or aliases in lv, it, sk, da, fi, el, fr, bg, pt, et, ga, hu, sl, ro, es, hr, sv, nl, cs, lt, mt, de, and other parts

22 October 2022

10 July 2022

  • curprev 12:2812:28, 10 July 2022DG Regio talk contribs 58,112 bytes +36,086 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

17 December 2021

14 December 2021

3 December 2021

21 September 2021

25 July 2021

7 July 2021

  • curprev 14:5614:56, 7 July 2021DG Regio talk contribs 12,072 bytes +139 Changed label, description and/or aliases in en: translated_label
  • curprev 14:5614:56, 7 July 2021DG Regio talk contribs 11,933 bytes +1,731 Created claim: summary (P836): The project aims to build the A1 motorway, the end of the Czestochowa – Tuszyn ring road, long. 80.71 km, located in the corridor of the TEN-T Baltic – Adriatic core network. Administratively, the investment is located in two voivodships: Łódzkie (63.81 km) and Silesian (16.91 km). The investment will be carried out in the P&B formula, consisting of the following sections, carried out as separate contracts for construction works: • Section A – w...

21 May 2021

20 May 2021