Revision history of "Extension of the Waste Management Plant Nowy Dwór Sp. z o.o." (Q2692979)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 21:4821:48, 8 October 2024DG Regio talk contribs 97,818 bytes +5 Changed label, description and/or aliases in pt
  • curprev 21:4821:48, 8 October 2024DG Regio talk contribs 97,813 bytes +11 Set a claim value: summary (P836): O projeto prevê: AWW (em inglês). 1 Trabalho de preparação. — doc: sala de triagem; reconstrução da praça, estação de transformação.; O Caminho do Edu. AWW (em inglês). 2 Processo de triagem 1.Construção de uma linha de tratamento de resíduos recolhe seletivamente e construção de uma sala na ZZO – realizada 2.Construção de uma sala de triagem com infraestruturas (eletrificação da recolha) 3.linha de seleção tecnológica com prensa (seletor de recolha...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

21 October 2022

10 July 2022

  • curprev 12:2712:27, 10 July 2022DG Regio talk contribs 92,255 bytes +61,312 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

17 December 2021

14 December 2021

3 December 2021

21 September 2021

25 July 2021

7 July 2021

  • curprev 14:5514:55, 7 July 2021DG Regio talk contribs 13,627 bytes +120 Changed label, description and/or aliases in en: translated_label
  • curprev 14:5514:55, 7 July 2021DG Regio talk contribs 13,507 bytes +3,078 Created claim: summary (P836): The project foresees: AWW. 1 Preparation work. — doc: sorting hall; reconstruction of the square, transforming station.; the edu path. AWW. 2 Sorting process 1.Building a waste treatment line collects selectively and constructing a hall in ZZO – realised 2.Building a sort hall with infrastructure (collection electrification) 3.Technol. selection line with press (collection selector) – to implement 4.Purchasing capacity. Municipalities – implemen...

21 May 2021

20 May 2021