Revision history of "Construction of a system of two cogeneration units of natural gas for the production of electricity and heat on plot No 93/31 within Prawcin" (Q2692826)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:4520:45, 2 March 2023DG Regio talk contribs 88,935 bytes −606 Changed label, description and/or aliases in lv, it, fr, da, sv, ro, es, sk, bg, el, fi, de, hr, hu, cs, et, sl, pt, ga, lt, mt, nl, and other parts

21 October 2022

28 July 2022

  • curprev 00:2100:21, 28 July 2022DG Regio talk contribs 88,287 bytes +57,946 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

17 December 2021

14 December 2021

3 December 2021

21 September 2021

25 July 2021

7 July 2021

  • curprev 13:4913:49, 7 July 2021DG Regio talk contribs 13,653 bytes +200 Changed label, description and/or aliases in en: translated_label
  • curprev 13:4913:49, 7 July 2021DG Regio talk contribs 13,453 bytes +2,839 Created claim: summary (P836): The main objective of the project is to launch an installation producing electricity and heat in the technology of high-efficiency cogeneration from natural gas. Achieving the target will make it possible to achieve a positive impact on the environment by providing significant quantified energy savings and enabling an increase in the use of high-efficiency cogeneration in Poland. The installation of high-efficiency cogeneration will be located o...

21 May 2021

20 May 2021