Revision history of "SM Mlekpol – 1.2 MW cogeneration with biogas plant in Grajewo" (Q2692812)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 18:2118:21, 7 October 2024DG Regio talk contribs 52,310 bytes +2 Changed label, description and/or aliases in pt
  • curprev 18:2118:21, 7 October 2024DG Regio talk contribs 52,308 bytes +37 Set a claim value: summary (P836): O projeto em questão envolve a construção de uma nova unidade de produção de eletricidade e calor em tecnologia de cogeração de elevada eficiência a partir de FER com uma capacidade nominal total de 1,2 MW. O investimento será realizado nas instalações de uma estação de tratamento de águas residuais em Grajewo, propriedade da SM Mlekpol, num terreno com o número cadastral 1917. A recorrente é proprietária da parcela de terreno em causa. O motor de c...

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:4520:45, 2 March 2023DG Regio talk contribs 49,511 bytes −756 Changed label, description and/or aliases in lv, it, da, ro, sk, cs, pt, de, sv, et, lt, sl, ga, bg, hu, es, fr, hr, mt, fi, el, nl, and other parts

21 October 2022

10 July 2022

  • curprev 12:2412:24, 10 July 2022DG Regio talk contribs 49,020 bytes +29,868 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

17 December 2021

14 December 2021

3 December 2021

21 September 2021

25 July 2021

7 July 2021

  • curprev 13:4913:49, 7 July 2021DG Regio talk contribs 10,522 bytes +122 Changed label, description and/or aliases in en: translated_label
  • curprev 13:4913:49, 7 July 2021DG Regio talk contribs 10,400 bytes +1,430 Created claim: summary (P836): The project in question involves the construction of a new unit for the generation of electricity and heat in high-efficiency cogeneration technology from RES with a total rated capacity of 1.2 MW. The investment will be located on the premises of an on-site sewage treatment plant in Grajewo, owned by SM Mlekpol, on land with cadastral number 1917. The applicant is the owner of the plot of land in question. The cogeneration engine will be powere...

21 May 2021

20 May 2021