Revision history of "Construction of gas cogeneration with a capacity of 0.999 MWe at AMICA S.A." (Q2692783)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:4520:45, 2 March 2023DG Regio talk contribs 75,782 bytes +834 Changed label, description and/or aliases in lv, it, bg, sk, fr, hu, el, es, ro, ga, fi, et, cs, de, sv, pt, hr, sl, lt, nl, mt, and other parts

3 November 2022

  • curprev 13:2113:21, 3 November 2022DG Regio talk contribs 74,948 bytes +47,471 Changed label, description and/or aliases in ga, da, el, sv, ro, sl, lt, hu, fi, sk, et, mt, lv, bg, pt, hr, cs, nl, fr, de, it, pl, es, and other parts

21 October 2022

19 January 2022

15 January 2022

17 December 2021

14 December 2021

3 December 2021

21 September 2021

25 July 2021

7 July 2021

  • curprev 13:2413:24, 7 July 2021DG Regio talk contribs 12,508 bytes +134 Changed label, description and/or aliases in en: translated_label
  • curprev 13:2413:24, 7 July 2021DG Regio talk contribs 12,374 bytes +2,343 Created claim: summary (P836): The planned project will include the construction of a high-efficiency cogeneration system consisting of a single generator with a capacity of 0.999 MWe (maximum thermal power of the engine is 1.03 MWt), powered by natural gas, for the production of electricity and heat and steam in combination with the reconstruction of a small network infrastructure for connection to steam boiler and heating plant for Amica S.A. This system will be based on th...

21 May 2021

20 May 2021