Revision history of "Construction of an installation for the production of heat from biomass with a capacity of 5.1 MW in Tomaszów Mazowiecki." (Q2692716)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 07:2207:22, 10 October 2024DG Regio talk contribs 54,152 bytes +34 Changed label, description and/or aliases in pt
  • curprev 07:2207:22, 10 October 2024DG Regio talk contribs 54,118 bytes +24 Set a claim value: summary (P836): O objeto do estudo de viabilidade é a construção de uma instalação para a produção de calor a partir de biomassa com uma capacidade de 5,1 MW em Tomaszów Mazowiecki. O projecto será executado com base em soluções técnicas típicas disponíveis no mercado. Tal permitirá manter a durabilidade do projeto através do acesso a peças sobresselentes e ao serviço autorizado, bem como utilizar o procedimento concorrencial na aquisição do dispositivo juntamente...

7 March 2024

15 January 2024

6 July 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:4420:44, 2 March 2023DG Regio talk contribs 51,333 bytes −1,186 Changed label, description and/or aliases in lv, it, sk, da, fi, sv, fr, bg, el, et, ga, ro, pt, sl, cs, hu, es, mt, nl, hr, de, lt, and other parts

19 October 2022

10 July 2022

  • curprev 12:2312:23, 10 July 2022DG Regio talk contribs 51,703 bytes +31,338 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

17 December 2021

14 December 2021

3 December 2021

21 September 2021

25 July 2021

7 July 2021

  • curprev 13:2113:21, 7 July 2021DG Regio talk contribs 10,757 bytes +182 Changed label, description and/or aliases in en: translated_label
  • curprev 13:2113:21, 7 July 2021DG Regio talk contribs 10,575 bytes +1,513 Created claim: summary (P836): The subject of the feasibility study is the construction of an installation for the production of heat from biomass with a capacity of 5.1 MW in Tomaszów Mazowiecki. The project will be implemented on the basis of typical technical solutions available on the market. This will allow to maintain the durability of the project through access to spare parts and authorised service, as well as to use the competitive procedure in the purchase of the dev...

21 May 2021

20 May 2021