Revision history of "Power supply in Blekinge, power, capacity and flexibility" (Q2661134)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

7 October 2024

  • curprev 18:1118:11, 7 October 2024DG Regio talk contribs 58,471 bytes 0 Set a claim value: summary (P836): Atualmente, não existe uma revisão regional mais abrangente se a rede elétrica de Blekinge satisfizer as necessidades futuras. Estamos também a começar a aumentar a preocupação entre as empresas se podemos ter uma escassez de energia. Para que Blekinge esteja equipada e seja um condado robusto, precisamos saber qual é o ponto de partida e como, com o tempo, podemos nos impedir de acabar em uma situação como Mälardalen, partes de Skåne, Estocolmo e G...

22 March 2024

10 June 2023

21 December 2022

27 July 2022

  • curprev 23:1323:13, 27 July 2022DG Regio talk contribs 58,153 bytes +35,590 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, nl, fr, de, it, es, sv, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro,

12 January 2022

11 January 2022

16 December 2021

15 December 2021

28 November 2021

  • curprev 09:1509:15, 28 November 2021DG Regio talk contribs 17,952 bytes +1,714 Created claim: summary (P836): Een uitgebreidere regionale evaluatie ontbreekt momenteel als het elektriciteitsnet in Blekinge voldoet aan de toekomstige behoeften. Het begint ook de bezorgdheid van bedrijven op te wekken als we geen effect kunnen sorteren. Om Blekinge toe te rusten en een robuust district te zijn, moeten we weten wat het uitgangspunt is en hoe we op tijd kunnen voorkomen dat we in een situatie als Mälardalen, delen van Skåne, Stockholm en Göteborg terechtkom...
  • curprev 09:1509:15, 28 November 2021DG Regio talk contribs 16,238 bytes +133 Changed label, description and/or aliases in nl: translated_label

27 November 2021

  • curprev 14:5414:54, 27 November 2021DG Regio talk contribs 16,105 bytes +1,575 Created claim: summary (P836): Eine umfassendere regionale Überprüfung fehlt derzeit, wenn das Stromnetz in Blekinge künftigen Bedürfnissen entspricht. Es fängt auch an, unter den Unternehmen Bedenken zu wecken, wenn wir keinen Effekt haben können. Um Blekinge auszustatten und eine robuste Grafschaft zu sein, müssen wir wissen, was der Ausgangspunkt ist und wie wir uns mit der Zeit daran hindern können, in eine Situation wie Mälardalen, Teile von Skåne, Stockholm und Göteborg...
  • curprev 14:5414:54, 27 November 2021DG Regio talk contribs 14,530 bytes +126 Changed label, description and/or aliases in de: translated_label

25 November 2021

  • curprev 18:5218:52, 25 November 2021DG Regio talk contribs 14,404 bytes +1,861 Created claim: summary (P836): Un examen régional plus complet fait actuellement défaut si le réseau électrique de Blekinge répond aux besoins futurs. Elle commence également à susciter des inquiétudes au sein des entreprises si nous pouvons avoir un manque d’effet. Pour que Blekinge soit équipé et un comté robuste, nous devons savoir quel est le point de départ et comment nous pouvons à temps nous empêcher de tomber dans une situation comme Mälardalen, certaines parties de S...
  • curprev 18:5218:52, 25 November 2021DG Regio talk contribs 12,543 bytes +133 Changed label, description and/or aliases in fr: translated_label

9 July 2021

21 June 2021

21 May 2021

20 May 2021

17 May 2021

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)