Revision history of "INTERMITTENT INSTALLER AND MAINTENANCE SYSTEM FOR RENEWABLE ENERGY TECHNOLOGIES AND ELECTRICAL AND PHOTOVOLTAIC INSTALLATIONS" (Q2165980)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 19:5519:55, 8 October 2024DG Regio talk contribs 61,838 bytes +2 Changed label, description and/or aliases in pt
  • curprev 19:5519:55, 8 October 2024DG Regio talk contribs 61,836 bytes +8 Set a claim value: summary (P836): LINHA 3 (QUALIFICAÇÃO): INSTALADOR INTERMITENTE E SISTEMA DE MANUTENÇÃO PARA TECNOLOGIAS ENERGÉTICAS RENOVÁVEIS E INSTALAÇÕES ELÉCTRICAS E FOTOVOLTAÍAS (RES). 400 HORÁRIOS DE FORMAÇÃO + 150 HORÁRIOS DE FORMAÇÃO POR PÚBLICO NAS ESCOLAS E NEGÓCIOS DE CRAÇAS. ESCORTA DE SAÍDA: 15 H/PUPIL; No que diz respeito à linha 3, a medida de formação baseou-se no perfil profissional regional do instalador e do principal gestor das instalações energéticas alimenta...

22 March 2024

20 June 2023

10 June 2023

26 April 2023

8 April 2023

6 July 2022

  • curprev 21:0621:06, 6 July 2022DG Regio talk contribs 59,220 bytes +39,553 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

25 January 2022

25 December 2021

24 December 2021

23 December 2021

29 December 2020

3 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 10:5810:58, 23 March 2020DG Regio talk contribs 10,338 bytes +1,313 Created claim: summary (P836): LINE 3 (QUALIFICATION): INTERMITTENT INSTALLER AND MAINTENANCE SYSTEM FOR RENEWABLE ENERGY TECHNOLOGIES AND ELECTRIC AND PHOTOVOLTAIC (RES) INSTALLATIONS. 400 HOURS OF TRAINING + 150 HOURS OF TRAINING HOURS PER PUPIL IN SHOPS AND CRAFT BUSINESSES. EXIT ESCORT: 15 H/PUPIL; AS FAR AS LINE 3 IS CONCERNED, THE TRAINING MEASURE HAS BEEN BASED ON THE REGIONAL VOCATIONAL PROFILE OF THE INSTALLER AND MAINORE EXTRAORDINARY MAINTENANCE OF ENERGY INSTALLAT...

17 March 2020

12 March 2020