Revision history of "126_NUREC_431ENERGY EFFICIENCY WORK OF THE CITY HALL AND CONSTRUCTION OF A MICRO-NETWORK BETWEEN BUILDINGS" (Q2155116)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 April 2023

1 September 2022

27 August 2022

6 July 2022

  • curprev 16:0216:02, 6 July 2022DG Regio talk contribs 44,477 bytes +28,467 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

7 February 2022

25 January 2022

25 December 2021

24 December 2021

23 December 2021

3 November 2020

15 July 2020

8 June 2020

24 March 2020

  • curprev 17:0217:02, 24 March 2020DG Regio talk contribs 9,234 bytes +794 Created claim: summary (P836): THE PROJECT WILL CONNECT THE TWO BUILDINGS VIA A MICRO NETWORK. IN PARTICULAR, IT PROVIDES FOR THE DISTRIBUTION OF ELECTRICITY THROUGH A SINGLE POD, CONNECTED TO THE EXISTING RENEWABLE ENERGY PRODUCTION PLANT AND TO A BATTERY STORAGE SYSTEM. THE MICRO NETWORK WILL BE OPERATED BY A DIGITAL COMMUNICATION, SMART METERING, CONTROL AND FLOW MONITORING SYSTEM WHICH MAXIMISES THE CONTROL AND EFFICIENCY OF THE ENERGY SYSTEM., Adding English summary
  • curprev 09:3709:37, 24 March 2020DG Regio talk contribs 8,440 bytes +433 Changed an Item

20 March 2020

18 March 2020

12 March 2020