Revision history of "MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED INLAND WATERWAY SYSTEM OF THE EASTERN PART OF THE EASTERN AREA OF NAPLES, SITUATED AT THE DISPOSAL OF THE EAST AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTERN AREA OF THE EASTER" (Q2150680)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 05:1505:15, 11 October 2024DG Regio talk contribs 55,401 bytes +1 Changed label, description and/or aliases in pt
  • curprev 05:1505:15, 11 October 2024DG Regio talk contribs 55,400 bytes −49 Set a claim value: summary (P836): A execução dos trabalhos de bordo permite a melhoria das condições de segurança dos navios que se dirigem actualmente ao porto de navios, permitindo uma melhoria significativa do manobrista e da amarração dos navios. Trata-se da dragagem de materiais para os cadáveres depositados nos depósitos de armazenagem fechados do porto de Napol. No âmbito da dragagem, prevê-se a demolição da jazida existente na Darsena Marinella, que é utilizada para o carreg...

7 March 2024

14 June 2023

12 June 2023

26 April 2023

8 April 2023

6 July 2022

  • curprev 14:0114:01, 6 July 2022DG Regio talk contribs 52,843 bytes +35,304 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

12 February 2022

10 February 2022

25 January 2022

25 December 2021

24 December 2021

23 December 2021

3 November 2020

15 July 2020

8 June 2020

24 March 2020

23 March 2020

  • curprev 11:2011:20, 23 March 2020DG Regio talk contribs 9,391 bytes +983 Created claim: summary (P836): THE IMPLEMENTATION OF THE CABLE WORKS ALLOWS FOR THE IMPROVEMENT OF THE SAFETY CONDITIONS FOR SHIPS CURRENTLY CALLING AT THE PORT OF NAPLES, ALLOWING FOR A SIGNIFICANT IMPROVEMENT OF MANOEUVRE AND OF THE MOORING OF SHIPS. THIS CONCERNS THE DREDGING OF MATERIALS FOR THE DECADES DEPOSITED IN THE CLOSED STORAGE TANKS OF THE LEVANT HARBOUR IN THE HARBOUR OF THE HARBOUR OF THE PORT OF NAPOL. IN THE CONTEXT OF THE DREDGING, IT IS PLANNED TO DEMOLISH T...

20 March 2020

17 March 2020

12 March 2020